Australian-basedCapability statementWorking with GroundMapContact
GROUNDMAPGeospatial

Hobart, Tasmania · classified: ground, low, medium and high vegetation, and buildings · Showcase

Industries

Construction and tunnelling

Existing conditions, progress and as‑built, above and below ground.

Existing conditions before design, volumes and progress during the works, and as‑built against the design model at handover, above ground and below. Each repeat survey is aligned to the last and graded point by point against the surveys' agreement on stable ground.

  • 13.2 mm · held-out median mismatch between two survey campaigns · Satsop
Registration agreement between scans, not absolute accuracy against control.
UNDERGROUND AND INDOORSatsop plant from above, cut away at the main level: rooms, corridors and the containment ring, two survey campaigns fused on a 2 cm grid
Satsop, Washington · an unfinished nuclear power plant, two survey campaigns fused on a 2 cm grid
Satsop plant study Showcase: GroundMap processing of public survey data. Survey data: DARPA Subterranean Challenge (Urban Circuit, Satsop, Washington, February 2020) / US Army Research Laboratory (no licence on record). Processing: GroundMap. No affiliation with the site owner or the survey teams.

What we deliver

01

Existing conditions

Terrain, structures and services before design.

02

Earthworks and progress

Cut, fill and progress volumes at every capture.

03

As-built against design

Built geometry compared with the design model.

04

Tunnel profiles

Profiles, overbreak and underbreak from mobile and SLAM scans.

05

Clearance and deformation

Clearance envelopes and movement over time.

06

Neighbouring structures

Adjacent buildings recorded before and after the works.

Talk to us

Start a
project.

Tell us the site and the deadline. A pilot on your own data under a written pilot agreement, before any paid engagement.